132593B BOILER REPLACEMENT PROJECT

Major components of Project Work consist of: Asbestos and lead based paint abatement. Demolition of existing boiler house and construction of a new 4,700 s/f pre-fabricated metal building with three 1,200 HP steam boilers, Selective Catalytic Reactor, 30,000 gallon LPG storage tank, 210,000-gallon fire water storage tank and pump, piping, paving, fencing, retaining wall excavation, manholes, cast in place concrete, asphalt, electrical raceway, wiring , cable, transformers, pole lines, panel boards, switchgear, generator and related work.