004206 FTB-SAN DIEGO BLDG 2ND FLOOR BUILD OUT

Provide construction to build out the South-East corner of the San Diego building's second floor including electrical, mechanical, plumbing and fire alarm. Americas with Disabilities (ADA) modifications on the first and second floor restrooms, drinking fountains, elevators and lockers; exterior sidewalk and parking improvements are required. In addition, the contractor will be responsible to purchase and install audio visual equipment and furniture. The contractor will be required to work some tasks after hours and/or weekend time to allow work to be performed while FTB work is being performed; avoiding noise and disturbance.
  Project Manual (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
PROJECT MANUAL 1OF3 218.2 MB
PROJECT MANUAL 2OF3 196.8 MB
PROJECT MANUAL 3OF3 220.5 MB