004206 FTB-SAN DIEGO BLDG 2ND FLOOR BUILD OUT

Provide construction to build out the South-East corner of the San Diego building's second floor including electrical, mechanical, plumbing and fire alarm. Americas with Disabilities (ADA) modifications on the first and second floor restrooms, drinking fountains, elevators and lockers; exterior sidewalk and parking improvements are required. In addition, the contractor will be responsible to purchase and install audio visual equipment and furniture. The contractor will be required to work some tasks after hours and/or weekend time to allow work to be performed while FTB work is being performed; avoiding noise and disturbance.
No files available