006417A DMV-BELL GARDENS FIELD OFFICE ACCESS BARRIER REMOVAL PHASE 1

Remove Asphalt Concrete (AC) paving, wheel stops, raised curbs, parking striping, and AC pavement. Provide Portland Cement Concrete (PCC) paving, raised curbs, AC pavement, ramp, truncated domes, speed table cross walks, trench drain, striping and other signage.
  Project Manual (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
PROJECT MANUAL 70.2 MB