006417A DMV-BELL GARDENS FIELD OFFICE ACCESS BARRIER REMOVAL PHASE 1

Remove Asphalt Concrete (AC) paving, wheel stops, raised curbs, parking striping, and AC pavement. Provide Portland Cement Concrete (PCC) paving, raised curbs, AC pavement, ramp, truncated domes, speed table cross walks, trench drain, striping and other signage.
  Addendum No.1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
6417A - Addendum No. 1 with attachment 160.0 KB