004533 RONALD REAGAN BUILDING AUTOMATIC TRANSFER SWITCH REPLACEMENT

Major components of Project Work consist of: Remove total of (5) Existing Automatic Transfer Switches in room MB106 and B201, and install (5) new Switches. Any damages caused during the work including, but not limited to, the concrete pad/floor must be repaired.
  Bid Documents (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
BID DOCUMENTS 838.0 KB
  Project Manual (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
PROJECT MANUAL 3.8 MB