004533 RONALD REAGAN BUILDING AUTOMATIC TRANSFER SWITCH REPLACEMENT

Major components of Project Work consist of: Remove total of (5) Existing Automatic Transfer Switches in room MB106 and B201, and install (5) new Switches. Any damages caused during the work including, but not limited to, the concrete pad/floor must be repaired.
  Plans (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
001_G000 19.3 MB
002_G001 7.0 MB
003_A100 11.0 MB
004_A101 11.0 MB
005_A102 10.8 MB
006_A201 4.5 MB
007_A202 5.6 MB
008_E101 11.3 MB
009_E102 6.0 MB
010_E200 7.1 MB
011_E201 7.7 MB
  Reference Documents (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
012_E0.1 10.4 MB
013_E0.2 6.1 MB
014_E1.1 8.5 MB
015_E1.2 7.4 MB
016_E1.3 6.5 MB
017_E1.4 8.0 MB
018_E2.107 8.4 MB
019_E2.108 6.9 MB
020_E2.109 8.4 MB
021_E2.110 7.3 MB
022_E2.111 5.8 MB
023_E2.112 6.8 MB
024_E2.113 11.3 MB
Product Specs 7.2 MB