004533 RONALD REAGAN BUILDING AUTOMATIC TRANSFER SWITCH REPLACEMENT

Major components of Project Work consist of: Remove total of (5) Existing Automatic Transfer Switches in room MB106 and B201, and install (5) new Switches. Any damages caused during the work including, but not limited to, the concrete pad/floor must be repaired.
No files available