140929 UPGRADE BOILERS & STEAM DISTRIBUTION, PORTERVILLE DEVELOPMENT CENTER

Major components of Project Work consist of: Demolition, hazardous material abatement, excavation, manholes, fencing, cast in place concrete, metal fabrications, pipe railings, bar gratings, fire stopping, joint sealants, hollow metal doors and frames, painting, high performance coatings, toilet bath and laundry accessories , valves, hangers and supports, vibration and seismic controls, plumbing equipment and pipe insulation, steam, condensate, water, waste and vent piping, fuel and gas piping, meters and gauges, water treatment, pumps, deaerators, boiler equipment, exhaust and chimney systems, steam traps and equipment, low voltage electrical conductors and cabling, electrical raceway, wiring, cable, and related work.
  Addendum No.1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
ADDENDUM NO 1 180.4 KB
  Addendum No.2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
140929 Addendum No. 2 with attachments 412.7 KB
  Addendum No.3 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
140929 - Addendum No. 3 with attachment 161.0 KB