003123 East End Block 225 – Sewage Ejector and Grease Separator Project

Major components of Project Work consist of: Replace packaged sanitary sewer lift station, packaged grease interceptor system and controls with similar systems and modify existing sanitary sewer and grease waste piping as needed to accommodate the new systems and connect to existing power distribution.
  Project Manual (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
PROJECT MANUAL 3.1 MB