004365 RECTOR RESERVOIR RIPRAP REPAIR

Major components of Project Work consist of: Install new riprap to prevent erosion of existing dam. Remove all vegetation and debris in the area to receive new riprap and prepare surfaces for installation of riprap.
  Addendum No.1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
4365 - Addendum No. 1 with attachment 6.12.2020 180.2 KB
  Addendum No. 2 Plans (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
4365 - Addendum No. 2 125.2 KB
JCCA Drawing T1.0 229.8 KB