132593E BOILER REPLACEMENT PROJECT

Minor demolition and relocation of existing utilities, paving and landscaping. Addition of a new supplemental boiler adjacent to an existing boiler house. New construction includes providing a new pre-fabricated metal building, a 1-1000 HP steam boiler, an SCR urea to ammonia emissions package, piping and paving. Abatement of existing minor asbestos and lead based paint is also included.