132593E BOILER REPLACEMENT PROJECT

Minor demolition and relocation of existing utilities, paving and landscaping. Addition of a new supplemental boiler adjacent to an existing boiler house. New construction includes providing a new pre-fabricated metal building, a 1-1000 HP steam boiler, an SCR urea to ammonia emissions package, piping and paving. Abatement of existing minor asbestos and lead based paint is also included.
  Addendum No.1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
132593E - Addendum No. 1 260.2 KB
  Addendum No.2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
132593E Addendum No. 2 157.3 KB
  Addendum No.3 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
132593E Addendum 3 with attachment REVISED 156.0 KB
  Addendum No.4 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
132593E Addendum #4 with attachments 240.0 KB