002537 VAN NUYS OFFICE BLDG SUITE # 303 REMODEL

Removal of asbestos containing material. Remove and replace interior finishes, lighting, and electrical receptacles. Install door hardware, data rack, patch panel, conduits and data cables, server room HVAC unit and balance HVAC system.
  Plans (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
001_T1.1 4.4 MB
002_A1.1 3.0 MB
003_A1.2 2.4 MB
004_A1.3 2.2 MB
005_A2.1 2.7 MB
006_A2.2 2.1 MB
007_A4.1 2.6 MB
008_A6.1 2.1 MB
009_A9.1 2.6 MB
010_M0.1 2.6 MB
011_M2.0 2.6 MB
012_M2.1 2.6 MB
013_M2.2 2.6 MB
014_M2.3 2.0 MB
015_M6.1 3.2 MB
016_E001 2.3 MB
017_E002 2.1 MB
018_E011 2.4 MB
019_E012 3.0 MB
020_E013 2.8 MB
021_E014 3.3 MB
022_E015 2.7 MB
023_E016 2.8 MB
024_E017 2.7 MB
025_E121 2.2 MB
026_E122 1.8 MB
027_E131 2.9 MB
028_E141 1.9 MB
029_E531 2.3 MB
030_E621 2.6 MB
031_E622 1.6 MB
032_FA121 2.8 MB