113432 UPPER TRUCKEE RIVER & MARSH RESTORATION

Pilot channel construction with biotechnical stabilization in the Upper Truckee Marsh (UTM); installation of a sheetpile bulkhead to isolate a lagoon from Tahoe Keys Marina; grading and revegetation between the Tahoe Keys Marina channel and the Upper Truckee River for restoration of marsh habitat; accessible trail construction; biotechnical flow resistance structures in Lower UTM; plant establishment; adaptive management as directed by State.
  Plans (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
001_T1 560.1 KB
002_T2 699.8 KB
003_G1 880.4 KB
004_G2 586.5 KB
005_G3 1.8 MB
006_G4 1.7 MB
007_G5 1.5 MB
008_SLS1 2.5 MB
009_PCS1 1.1 MB
010_PCS2 1.0 MB
011_PCS3 1.0 MB
012_C1 1.1 MB
013_C2 597.3 KB
014_C3 320.3 KB
015_C4 394.3 KB
016_C5 402.6 KB
017_C6 358.6 KB
018_C7 433.2 KB
019_C8 435.3 KB
020_C9 397.5 KB
021_C10 407.0 KB
022_C11 282.9 KB
023_C12 626.7 KB
024_C13 442.2 KB
025_IG1 542.4 KB
026_IG2 582.8 KB
027_XS1 211.0 KB
028_XS2 285.4 KB
029_XS3 243.1 KB
030_XS4 242.1 KB
031_XS5 210.1 KB
032_D1 235.0 KB
033_D2 311.4 KB
034_D3 313.8 KB
035_D4 367.3 KB
036_D5 418.4 KB
037_D6 219.6 KB
038_D7 581.2 KB
039_D8 343.8 KB
040_D9 488.3 KB
041_D10 242.1 KB
042_D11 346.6 KB
043_S1 644.2 KB
044_S2 243.1 KB
045_S3 783.3 KB
046_L1 150.3 KB