113432 UPPER TRUCKEE RIVER & MARSH RESTORATION

Pilot channel construction with biotechnical stabilization in the Upper Truckee Marsh (UTM); installation of a sheetpile bulkhead to isolate a lagoon from Tahoe Keys Marina; grading and revegetation between the Tahoe Keys Marina channel and the Upper Truckee River for restoration of marsh habitat; accessible trail construction; biotechnical flow resistance structures in Lower UTM; plant establishment; adaptive management as directed by State.
  Addendum No.1 (click to expand/collapse)
  Addendum No.2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
00 91 13 Addendum #2 221.2020 178.6 KB