001322 WATER TREATMENT PLANT FILTER BACKWASH AND SLUDGE HANDLING UPGRADES

Construction of a concrete equalization tank for the water treatment plant backwash water to be recycled to the head works of the facility, and a new pump station and force main to pump recycled water back to the water treatment plant through a connection through an existing water line. Gravity flow piping will be installed from the existing filter drain to the new equalization tank. Electrical improvements include power to the new reservoir pump station and pump controls.