001322 WATER TREATMENT PLANT FILTER BACKWASH AND SLUDGE HANDLING UPGRADES

Construction of a concrete equalization tank for the water treatment plant backwash water to be recycled to the head works of the facility, and a new pump station and force main to pump recycled water back to the water treatment plant through a connection through an existing water line. Gravity flow piping will be installed from the existing filter drain to the new equalization tank. Electrical improvements include power to the new reservoir pump station and pump controls.
  Plans (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
001_G001 13.9 MB
002_G002 1.2 MB
003_G003 1.0 MB
004_G004 29.5 MB
005_G005 1.1 MB
006_G006 826.0 KB
007_C001 1.4 MB
008_C002 1.1 MB
009_C003 1.1 MB
010_C004 1.5 MB
011_C105 1.3 MB
012_C106 1.0 MB
013_C107 1.0 MB
014_C108 900.1 KB
015_C501 1.3 MB
016_C502 1.4 MB
017_C503 1.1 MB
018_S001 1.0 MB
019_S002 934.8 KB
020_S003 1.4 MB
021_S004 1.6 MB
022_S005 1.2 MB
023_S006 1.2 MB
024_S007 1.3 MB
025_S101 1.2 MB
026_M001 1.0 MB
027_M101 915.8 KB
028_M102 904.0 KB
029_M103 946.7 KB
030_M104 856.4 KB
031_M105 1.0 MB
032_M106 621.3 KB
033_M107 701.7 KB
034_E001 1.3 MB
035_E101 1.6 MB
036_E401 828.9 KB
037_E402 916.9 KB
038_E403 894.8 KB
039_E501 950.6 KB
040_E601 880.1 KB
041_E602 945.6 KB
042_E603 1.3 MB
043_I001 1.2 MB
044_I601 790.8 KB
045_I602 701.6 KB
046_I603 598.8 KB