006000 CDFW - ELECTRIC VEHICLE SUPPLY EQUIPMENT - DAVIS/GOLD RIVER

Install and electrically connect EVSE infrastructure to include wiring devices and all required associated items for a complete and operational system including required testing. provide the required saw cutting, trenching, backfilling and finishing of the affected lot surface and restore to original condition. Provide and install all items shown on the drawings and as specified unless otherwise noted as not in contract or existing to remain.
No files available