001894 DMV Santa Rosa HVAC Replacement

Replacement of existing rooftop multizone HVAC unit, rooftop chiller, rooftop boiler, pumps, piping and all associated accessories, and removal of ice storage tanks located in the Mechanical Yard. Furnish and install new supply diffusers and return registers. Furnish and install a new Energy Management System (EMS) with remote monitoring and control.
  APPENDIX A (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
APPENDIX A 3.2 MB
  Project Manual (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
PROJECT MANUAL 58.6 MB